Project •
On the Dolingadreef in Amsterdam-Zuidoost, the new ING HQ was completed on 29 March 2019. The office contains five floors, consisting of two connected buildings, each with an atrium. The building provides space for approximately 2,900 people and is part of ING’s future campus. The ING campus will be a dynamic environment that stimulates creativity, innovation and cooperation.
The design of ING HQ has achieved the BREEAM-NL Outstanding certificate in February 2018. Through excellent insulation, PV panels and smart technology, the building is energy positive. This makes the office building one of the most sustainable buildings in the Netherlands within the sustainability label. Moreover, it is entirely possible that the BREEAM score will be exceeded upon completion.
The C2N team is involved in the role of sustainability advisor and BREEAM-NL expert, whereby we see it as our task to ensure, in all phases of the entire process, that the sustainability ambitions of the client are realised.
Opdrachtgever
Project
Locatie
Segment
BVO
Rol C2N
Navigation